Great serviceOn 04/19/2024 by H. P. (verified customer)
The correct sub-panel to pass inspection with your building inspector. If your spa is wired 220volt then you’ll need the correct sub panel with the GFCI breaker(s). This is to comply with your spa manufacturer’s UL Listing. To pass inspection with your local building department and to be covered by your homeowner’s insurance, one of these sub-panels has to be wired in-line between your main electrical service (meter) and your spa.
Showing the single result
-
Sku: 71052
Conduit, Flex 230V
Obsolete: No factory suggested replacement available at this time Please contact our technicians for advice (805) 541-9000 or wizard@backyardplus com Conduit, Flex 230V
Showing the single result